Materials Costs
Patching Materials N/A $100.00
Housing For Engines 2 Units $100,000.00
Oxygen Canisters x Units $700.00
Piping For Oxygen & Cooling Engines N/A $100,000.00
Oxygen Over First Six Months N/A $1,000,000.00
Steel N/A $1,400,000.00
Acrylics 1 Unit $1,000,000.00
Fuel For Ship Over Six Months N/A $1,000,000.00
Hydrogen Fuel Cells x Units $2,500,000.00
Water Sampler Materials 80 Units $20,000,000.00
Rock Sampler Materials 2 Units $1,600,000.00
Control Console Materials 2 Unit $21,000.00
Umbilical Cord Materials 3 Units $450,000.00
Water N/A $1,200,000.00
Special Hatch & Flood Room Materials N/A $975,000.00
Plumbing, Walls, Wiring, Air Vents, & General Infrastructure N/A $1,600,000.00
Fiber Optic Cables ($16/m) 1400m $22,400.00
Wires N/A $8,000.00
SubTotal $32,977,200.00