Materials Costs
|
| Patching Materials | N/A | $100.00 |
| Housing For Engines | 2 Units | $100,000.00 |
| Oxygen Canisters | x Units | $700.00 |
| Piping For Oxygen & Cooling Engines |
N/A | $100,000.00 |
| Oxygen Over First Six Months | N/A | $1,000,000.00 |
| Steel | N/A | $1,400,000.00 |
| Acrylics | 1 Unit | $1,000,000.00 |
| Fuel For Ship Over Six Months |
N/A | $1,000,000.00 |
| Hydrogen Fuel Cells | x Units | $2,500,000.00 |
| Water Sampler Materials | 80 Units | $20,000,000.00 |
| Rock Sampler Materials | 2 Units | $1,600,000.00 |
| Control Console Materials | 2 Unit | $21,000.00 |
| Umbilical Cord Materials | 3 Units | $450,000.00 |
| Water | N/A | $1,200,000.00 |
| Special Hatch & Flood Room Materials |
N/A | $975,000.00 |
| Plumbing, Walls, Wiring, Air Vents, & General Infrastructure |
N/A | $1,600,000.00 |
| Fiber Optic Cables ($16/m) | 1400m | $22,400.00 |
| Wires | N/A | $8,000.00 |
|
SubTotal
|
$32,977,200.00
|