Atlantis II
BioScience Team | GeoScience Team | Environment | Habitat Design | Transportation |
Manned Operations | Robotics Operations | Health and Safety | Fundraising | Communications |
The Habitat
![]() The Hub Mission Statement Current Ideas Design Notes Research Notes The Creation of Life |
![]() |
Research Outline:![]() |
![]() |
Power Source: Solar/gas Drop line connection: (4 allocates space, 10 designs) Network Uplink Connection: (4 allocates space, 10 designs) Docking for fuel resupply Battery backup systems: 4 days |
![]() |
Cable Connection Storage: Need #'s from 8. Life Support Systems:
Bathroom design Exercise equipment: (numbers from 8 would help) Control Room:
Geolab (allocated by 4, designed by 2) Docking:
|
![]() |
Video Cameras Acoustic Receivers (acoustic modem?) (under 7's jurisdiction) Acoustic detectors EMR emmiters/receivers (Lights & special cameras) Anchor lines: (type?) Storage/Containment area (under 1's jurisdiction, might want to talk to 7 about manipulator arms) |
![]() |
3D models? Web Site Design (continuous) Persistent emails to other groups |