NASA MIR PROGRAM Mir 24 / NASA 5 Status Date: Sunday, August 24, 1997 Mission Day: Mir 24 / NASA 5 MD 19/101 Mir 24 CDR Anatoly Solovyov Mir 24 FE Pavel Vinogradov NASA 5 FE Mike Foale MIR STATION SYSTEM/SUBSYSTEM ACTIVITIES Today the ground uplinked a copy of the hydrolab training video which shows the activities that will be performed on the next EVA. The crew was expected to burn another three O2 candles today. Mike reported that he inspected the Kristall module today and there is condensation on the hull but not on any of the "boxes". MIR PAYLOAD ACTIVITIES Greenhouse Daily Ops DATA MANAGEMENT On-Board Nominal Network Status Nominal Ground Facilities Status Nominal OPERATIONS Procedures/Timelines Nothing to report, timeline for Monday was not available. Experiment Operations Greenhouse data: Date: Aug-24 Time: 16:18 PO6 = 30 PO7 =35 Flow Meter 1 = 56050 Flow Meter 2 =70165 Leaf Temp 1 = 15.6 Leaf Temp 2 = 13.1 DELTA TEMPS: Group 1 = 6.0 5.6 12.9 6.9 Group 2 = 8.1 13.6 8.5 13.1 Group 3 = 9.2 9.5 6.4 7.4 Group 4 = 6.0 0 9.0 10.6 Greenhouse - Daily ops were performed today. Mike reported that video was taken and will be downlinked later in the week. He also reported that the average temperature of the root module was 12C to 13C. Beetle - Power was restored shortly after August 22 EVA so the automatic light pulse is assumed to have proceeded as planned and the contingency workaround will not be needed. Experiment Hardware Nothing today Stowage/Transfer Nothing to report. SMP/Medical Mike continues to perform daily exercise according to the four day cycle. Environmental Parameters (Previous 24 hour period) Parameter Min. Max. Nominal Range Pressure (mmHg) Base Block 615 622 660 - 850 ppO2 (mmHg) 143 146 140 - 200 ppCO2 (mmHg) 3.1 4.5 up to 8.0 ppH20 (mmHg) 9.2 10.1 8 - 14 Humidity (percentage) 35 38 30 - 75 Temperature (°C) base block (BB) 26.2 27.2 18 - 28 COMMUNICATIONS SUMMARY A/G with Consultants Group 1627-1637 Greenhouse, Beetle info Kristall condensation CO kit status Packet - English form 24 and three personals were uplinked today. Uplink Video - Video of the hydrolab training for the upcoming (9/3) EVA was uplinked to the crew. ISSUES - None PLANNING MIR 24 / NASA 5 MD 20/102 Mir Payload Activities Greenhouse Daily Observations Video Downlink Other Activities EVA Preparation