NASA MIR PROGRAM
Mir 24 / NASA 5  Status


Date:	Sunday, August 24, 1997
Mission Day:	Mir 24 / NASA 5  MD  19/101

Mir 24 CDR 	Anatoly Solovyov
Mir 24 FE		Pavel Vinogradov
NASA 5 FE		Mike Foale


MIR STATION SYSTEM/SUBSYSTEM ACTIVITIES
Today the ground uplinked a copy of the hydrolab training video which shows the 
activities that will be performed on the next EVA.

The crew was expected to burn another three O2 candles today.

Mike reported that he inspected the Kristall module today and there is 
condensation on the hull but not on any of the "boxes".

MIR PAYLOAD ACTIVITIES
Greenhouse Daily Ops 

DATA MANAGEMENT
On-Board 
Nominal

Network Status 
Nominal

Ground Facilities Status 
Nominal

OPERATIONS
Procedures/Timelines  
Nothing to report, timeline for Monday was not available.
 
Experiment Operations
Greenhouse data:
Date: Aug-24
Time: 16:18
PO6 = 30			PO7 =35
Flow Meter 1 = 56050	Flow Meter 2 =70165
Leaf Temp 1 = 15.6	Leaf Temp 2 = 13.1
DELTA TEMPS:
Group 1 = 	6.0	5.6	12.9	6.9
Group 2 = 	8.1	13.6	8.5	13.1
Group 3 = 	9.2	9.5	6.4	7.4
Group 4 = 	6.0 	0	9.0	10.6

Greenhouse - Daily ops were performed today. Mike reported that video was taken and will be 
downlinked later in the week. He also reported that the average temperature of the root 
module was 12C to 13C.

Beetle - Power was restored shortly after August 22 EVA so the automatic light pulse is 
assumed to have proceeded as planned and the contingency workaround will not be needed. 

Experiment Hardware
Nothing today

Stowage/Transfer
Nothing to report.

SMP/Medical
Mike continues to perform daily exercise according to the four day cycle.

Environmental Parameters (Previous 24 hour period)
Parameter	Min.	Max.	Nominal Range 
Pressure (mmHg) Base Block	615	622	660 - 850
ppO2 (mmHg)	143	146	140 - 200
ppCO2 (mmHg)	3.1	4.5	up to 8.0
ppH20 (mmHg)	9.2	10.1	8 - 14
Humidity (percentage)	35	38		30 - 75 
Temperature (°C) base block (BB)  	26.2	27.2	18 - 28

COMMUNICATIONS SUMMARY
A/G with Consultants Group
1627-1637	Greenhouse, Beetle info
	Kristall condensation
	CO kit status

Packet - English form 24 and three personals were uplinked today.

Uplink Video - Video of the hydrolab training for the upcoming (9/3) EVA was 
uplinked to the crew.

ISSUES - None  

PLANNING

MIR 24 / NASA 5 MD 20/102
Mir Payload Activities
Greenhouse
   Daily Observations
   Video Downlink


Other Activities
EVA Preparation