6.033 AT A GLANCE, SPRING TERM, 1997, Revision 1.1 (PostScript)
Week of Monday |
Monday Lecture |
Tuesday Recitation |
Wednesday Lecture |
Thursday Recitation |
Friday Other |
2/3 - 2/7 |
R1: Lucky’s Bozos on the busFirst day of classes |
L1: Intro to systemsRead:Saltzer Ch 1 |
R2: Simon, Gabriel |
Writing Program Read:Gopen |
|
2/10 - 2/14 |
L2: Major lessons & technology trendsRead:Saltzer Ch 2 |
R3: Leveson |
L3: System structureRead:Tanenbaum Ch 1, Ward Ch 16 & 18 |
R4: X-window system |
|
2/17 - 2/21 |
Presidents Day |
L4: Virtual memoryRead:Tanenbaum Ch 3 |
L5: ThreadsRead:Tanenbaum Ch 2 |
R5: Mach (Tanenbaum Chapter 15 through 15.5) |
|
2/24 - 2/28 |
L6: ConcurrencyRead:Tanenbaum Ch 12.1 |
R6: Birrell’s threads (p1-p22) |
L7: Networking: overviewRead:Halstead I |
R7: Birrell and Nelson’s RPC |
|
3/3 - 3/7 |
L8: Network layersRead:Halstead II, Tanenbaum Ch 10.1 |
R8: Ethernet and High-speed switching (Sections 1-3) |
L9: Link and network layerRead:IP (RFC 791) |
R9: Mobile IPAssigned:Design Project 1 |
QUIZ 1: material through L8Add date |
3/10 - 3/14 |
L10: E/E layerRead:Saltzer Ch 7.5 |
R10: End-to-end argument, Holy war |
L11: Naming: overviewRead:Saltzer Ch 5.A |
R11: WWW, URLs, URNs, Tanenbaum Ch 14.2 |
Writing program |
3/17 - 3/21 |
L12: Naming networkRead:Saltzer Ch 5.C |
R12: Semantic file system |
L13: SecurityRead:Lerman, Crisis and aftermath |
R13: Mobile codeDue:Design Project1 |
|
3/24-3/28 |
Spring vacation: have fun! |
||||
3/31 - 4/4 |
L14: AuthenticationRead:Tanenbaum 4.4, Saltzer’s Protetion in computer systems (Sec. I) |
R14: Kerberos |
L15: AuthorizationRead:Tanenbaum 4.5, Saltzer’s Protetion in computer systems (Sec. II) |
R15: Why crypto systems fail |
|
4/7 - 4/11 |
L16: CertificationRead: |
R16: Saltzer Chapter 6 Appendix |
L17: Storage overviewRead:Digital documents, Tanenbaum Ch 5 |
R17: RAIDAssigned:Design Project 2 |
|
4/14- 4/18 |
L18: I/O bottleneckTanenbaum 4-4.3 |
R18: CFFS |
L19: Distributed storage systemsRead:Tanenbaum 13 |
R19: Coda |
QUIZ 2: material from R8 through R16 |
4/21 - 4/25 |
Patriot’s day |
Patriot’s day |
L20: Fault toleranceRead:Plauger, Petroski |
R20: Gray & Siewiorek, Space shuttleDrop date |
|
4/28 - 5/2 |
L21: TransactionsRead:Tanenbaum 11.4 |
R21: System R |
L22: Implementing transactions |
R22: Cirrus bankingDue:Design Project 2 |
|
5/5- 5/9 |
L23: Distributed transactionsRead:Brooks Ch 12 4 |
R23: Thor |
L24: ComplexityRead:Brooks Ch 5 8 11 |
R24: CONFIRM |
|
5/12-5/16 |
L25: Wrap up |
R25: Press, Lampson |
QUIZ 3: covers L17 through R24 |
Last day of classes |
NO FINAL! |
6.033 Handout 1: Tentative schedule (1/20/97).