Accomplished Wednesday: - Rear body seam finished - Firewall megapatch installed - Seat belt mounting holes plugged - Began fabrication of steering box (open-topped watertight enclosure around steering column in engine compartment) - Radiator stiffening bracket welded back on Thursday plans: - Finish firewall - Attach front of car, install front pontoon structure - Cut metal for pontoon sides - Weld in floor studs for boltless mounting of front seat - Much more -- plenty of work for everyone! Tools needed: - 4.5" cutting wheels and grinding wheels needed for angle grinder - Nicopress swaging tool (even the bolt-together type will work) - Offset-jaw aviation snips - Box fans (for keeping workers happy) Materials needed: - Large, long pieces of relatively thin (e.g. file cabinet) sheet steel - Empty plastic bottles with screw-top lids (esp. 2-liter) - Empty water-cooler bottles (round style preferred) - Empty 55 gallon drums (metal or plastic) THURSDAY - 8 PM - SOUTHIE LOCATION