|
|
|
|
Solid Rocket Launches, Tests: July 2003
|
|
|
|
|
|
Level 1 certification flights (July 19, 2003) |
|
|
 |
|
 |
| Prepping the rocket for launch |
|
Chris and Ben with a L1-certification rocket. |
|
|
|
|
|
|
Video payload test flight (July 24, 2003) |
|
|
 |
|
 |
| Prepping the payload test rocket. |
|
Ben, Isabel, and Ben setting up the launch platform. |
 |
|
 |
| The whole group finishing up launch platform set-up. |
|
Final checks before launching. |
|
|
|
|
|
|
Ignitor tests (early July, 2003) |
|
|
 |
|
 |
| James with the ignitor equipment. |
|
The ignitor test equipment and high-tech test stand. |
|
|