Overview
|
Sm
Med
Lg
Full
|
Description :
|
What the table looks like right now. Some scenery work has been done; this includes carving out large chunks of Styrofoam.
|
Date :
|
Sun 27 Feb 2005 10:22:19 PM EST
|
| | |
|
Engine
|
Sm
Med
Lg
Full
|
Description :
|
The venerable SW-9 comes around the curve at the front of the table.
|
Date :
|
Sun 27 Feb 2005 10:24:40 PM EST
|
| | |
|
Hill and Building
|
Sm
Med
Lg
Full
|
Description :
|
The train climbs the short grade between the hills and the warehouse.
|
Date :
|
Sun 27 Feb 2005 10:26:03 PM EST
|
| | |
|
Over the Hill
|
Sm
Med
Lg
Full
|
Description :
|
From behind the back-left corner of the table.
|
Date :
|
Sun 27 Feb 2005 10:27:16 PM EST
|
| | |
|
Pulling Away
|
Sm
Med
Lg
Full
|
Description :
|
The train goes on its way.
|
Date :
|
Sun 27 Feb 2005 10:27:34 PM EST
|
| | |
|
Depression
|
Sm
Med
Lg
Full
|
Description :
|
Hard to see from this angle, but there's a lake-to-be cut out of the base here.
|
Date :
|
Sun 27 Feb 2005 10:28:22 PM EST
|
| | |
|
"Bridge"
|
Sm
Med
Lg
Full
|
Description :
|
Someday, there will be a bridge here. For now the tracks are supported by the cork roadbed.
|
Date :
|
Sun 27 Feb 2005 10:29:22 PM EST
|
| | |
|
Above "Bridge"
|
Sm
Med
Lg
Full
|
Description :
|
This angle at least shows the train is over space...
|
Date :
|
Sun 27 Feb 2005 10:29:31 PM EST
|
| | |
|
Around the Lake
|
Sm
Med
Lg
Full
|
Description :
|
Here the train runs along a berm above the lake-to-be.
|
Date :
|
Sun 27 Feb 2005 10:30:02 PM EST
|
| | |
|
"Bridge" Front
|
Sm
Med
Lg
Full
|
Description :
|
Same gap in the foam seen from the front of the table.
|
Date :
|
Sun 27 Feb 2005 10:30:37 PM EST
|
| | |
|
More Bridgey
|
Sm
Med
Lg
Full
|
Description :
|
Oh, right, there's an actual bridge that goes in here. It's not actually installed yet, but I'm getting there.
|
Date :
|
Sun 27 Feb 2005 10:35:29 PM EST
|
| | |
|
More Bridgey
|
Sm
Med
Lg
Full
|
Description :
|
Right, if this was really installed there wouldn't be the stone walls falling off like this.
|
Date :
|
Sun 27 Feb 2005 10:35:41 PM EST
|
| | |
|
Back Corner
|
Sm
Med
Lg
Full
|
Description :
|
The train pulls around the back-right corner of the layout. There are little pink foam bits everywhere. Those should get cleaned up.
|
Date :
|
Sun 27 Feb 2005 10:36:44 PM EST
|
| | |
|
Corner
|
Sm
Med
Lg
Full
|
Description :
|
The entire train pulls around the back corner here. The lake-to-be is to the left of the third and fourth cars; the material removed to dig the lake is visible in the background.
|
Date :
|
Sun 27 Feb 2005 10:36:58 PM EST
|
| | |
|
Creek
|
Sm
Med
Lg
Full
|
Description :
|
Downstream of the pond, water will eventually drain out of a creek headed towards the front left of the layout.
|
Date :
|
Sun 27 Feb 2005 10:37:50 PM EST
|
| | |
|
Creek 2
|
Sm
Med
Lg
Full
|
Description :
|
This is downstream from the lake-to-be. There are a couple of trees here; you can see the hill in the back.
|
Date :
|
Sun 27 Feb 2005 10:38:18 PM EST
|
| | |
|
Hill and Building
|
Sm
Med
Lg
Full
|
Description :
|
The unfinished tracks wind behind the delivery building.
|
Date :
|
Sun 27 Feb 2005 10:38:30 PM EST
|
| | |
|
Hill face
|
Sm
Med
Lg
Full
|
Description :
|
The front edge of the hill is visible here.
|
Date :
|
Sun 27 Feb 2005 10:42:12 PM EST
|
| | |
|
Switching
|
Sm
Med
Lg
Full
|
Description :
|
Obligatory switching action. None of the edges of the layout have been painted at all; it's still pink all the way around.
|
Date :
|
Sun 27 Feb 2005 10:46:35 PM EST
|
| | |
|
Switching
|
Sm
Med
Lg
Full
|
Description :
|
A car is removed from the middle of the train.
|
Date :
|
Sun 27 Feb 2005 10:46:51 PM EST
|
| | |
|
Cleaning Car
|
Sm
Med
Lg
Full
|
Description :
|
This little gizmo is a track-cleaning car. The yellow cloth is wrapped around a brass roller. It's mostly a device for applying Goo-Gone or something similar to track and wiping it off.
|
Date :
|
Sun 27 Feb 2005 11:02:24 PM EST
|
| | |
|
Above Cleaning
|
Sm
Med
Lg
Full
|
Description :
|
The engine pushes the track-cleaning car around.
|
Date :
|
Sun 27 Feb 2005 11:03:30 PM EST
|
| | |
|
Above Hill
|
Sm
Med
Lg
Full
|
Description :
|
The entire train takes the curve at the back-left corner of the layout. The hill is at the bottom left. The parking lot for the delivery building is painted; there will eventually be a bridge across the creek.
|
Date :
|
Sun 27 Feb 2005 11:08:10 PM EST
|
| | |
|