1.
INTRODUCTION AND PLAN
CERTIFICATION
1-1
1.1
Introduction
1-1
1.2
Professional Engineer’s
Certification
1-2
1.3
Plan Revision and Amendment
1-3
1.4
Plan Distribution
1-4
2.
GENERAL SITE INFORMATION
2-1
3.
SPCC PLAN OVERVIEW
3-1
3.1
Campus Description
3-1
3.2
Oil Storage
3-1
3.3
MIT Policies on Oil Storage
3-2
4.
SPILL HISTORY (§ 112.7(a))
4-1
5.
POTENTIAL SPILLS - PREDICTION AND CONTROL AND
COUNTERMEASURES (§ 112.7(b) & (c))
5-1
5.1
Central Utility Plant, Building
N16
5-1
5.2
Central Utility Plant, Building
42
5-3
5.3
Wood Sailing Pavilion, Building
51
5-6
5.4
Pierce Boathouse, Building W8
5-7
6.
FACILITY DRAINAGE (§ 112.7(e)(1))
6-1
6.1
Indoor Drainage Systems
6-1
6.2
Outdoor Drainage Systems
6-1
7.
BULK STORAGE TANKS (§
112.7(e)(2))
7-1
7.1
Tank Materials and Construction (§
112.7(e)(2)(i))
7-1
7.2
Secondary Containment (§
112.7(e)(2)(ii))
7-2
7.3
Drainage of Stormwater from Diked Areas (§ 112.7(e)(2)(iii))
7-2
7.4
Buried or Partially Buried Metallic
Tanks (§ 112.7(e)(2)(iv and
v))
7-3
7.5
Aboveground Storage Tank Integrity
Testing (§
112.7(e)(2)(vi))
7-3
7.6