General Context
General Context
- High volume discrete manufacturing
- Significant capital investment in
production line
- Significant cost to having buffer
spaces
- Two or more models processed on the
line
- Model mix uncertain
- Production line modifications
difficult and expensive
Need methodology to design cost effective
flexible production lines that are robust to model mix changes