CBD-198. Flood-Proofing of BuildingsOriginally published October 1978. G.P. WilliamsThis Digest summarizes an extensive report1 on the flood-proofing of buildings by a firm of consultants for the Department of Fisheries and Environment Canada. The report assesses several methods of flood-proofing new and existing structures in Canada. Examples of design modifications, materials used, and costs for various types of structure under different flood conditions are listed to illustrate the factors that should he considered. Flood-proofing, or the design of buildings that can resist floods, is a means of reducing potential damage to structures built in flood plain areas. Existing buildings located in fringe flood zones or in areas where protection works such as dykes may not be adequate can be protected by design provisions. If flood control works are not economically feasible, the flood-proofing of new buildings may be an alternative way of flood protection, part of a comprehensive flood plain management program. Feasibility of Flood-Proofing An assessment of flood-proofing requires comprehensive study. Owners, builders, architects, engineers, municipal officials and planners - all must appreciate the need for detailed study of many interrelated factors in assessing the feasibility of flood-proofing buildings. Factors Related to Flood Characteristics
Structural Factors When flood waters surround a building they impose uplift and lateral loads on the structure and substructure. The pressures exerted by these loads must be determined in order to design adequate flood-proofing. Most commercial and industrial buildings have sufficient anchorage and connections and are massive enough to resist lateral forces produced by flood water. In contrast, residential buildings often require special design modifications because they do not have the necessary anchorage and are not massive enough to resist lateral forces. Uplift and lateral forces against a foundation slab and walls, caused by infiltration of flood water through the foundation backfill, are especially significant. In a typical house in Canada a total force of about 400,000 lb (180,000 kg) could be acting upward on the slab of the basement by the time flood water has reached basement window levels; and the lateral force against foundation walls could total 100,000 lb (45,000 kg). It is not surprising that foundation walls of flooded buildings have collapsed under such forces, that floor slabs have been destroyed, or the entire building lifted under buoyant forces. Economic Factors The decision to use flood-proofing, alone or in combination with flood protection works such as dykes, requires a cost-benefit analysis. If anticipated benefits exceed estimated costs (amortized on an annual basis), flood-proofing will be economically justified. Costs will vary considerably, depending on local flood characteristics, type and size of structure, financial terms of capital to be invested, and elevation to which the building must be protected. Benefits depend on the estimated flood damage that flood-proofing will prevent. Basic Flood-Proofing Methods Buildings on Fill New subdivisions or single buildings are often constructed on fill raised above the design flood level. This method is used most extensively for flood-proofing new buildings in Canada. It does not require design modifications, and if the design flood water level is exceeded, the depth of water over the fill will be shallow and of short duration. It is not, however, a practical alternative for protecting existing buildings. Buildings on Piers, Piles, Columns or Bearing Walls Elevating structures above design flood level on some kind of support provides reliable protection against flood damage. This method uses land efficiently, does not raise the flood level, and has minimal adverse effects on flood flows. This alternative requires careful design to prevent damage of supports from floating debris and to allow sufficient space for it to pass underneath. It cannot be used for large existing buildings and may be difficult to apply even to small, light structures. Making Lower Levels of Building Watertight (Closure and Seal Method) Flood-proofing the lower levels of buildings by sealing them against water penetration requires that they be made strong enough to withstand cracking from the lateral and uplift pressure of the water. Accordingly, careful design of drainage systems, floor slabs, basement walls, lower windows and all entrances is essential. This method can be used for existing structures if they are of adequate strength and built on soils of low permeability. The method requires an adequate flood warning system and pre-planned evacuation measures, for there is greater risk of catastrophic damage if design flood level is exceeded. It is not suitable for floods of long duration or where high flood depths are possible. Surrounding Buildings with Flood-Proof Walls or Berms This method involves generally the same considerations as those required in the design of small dams. It has several disadvantages such as increasing the possibility of catastrophic failure and is not practicable for individual buildings in dense urban areas. Wet Flood-Proofing The preceding four methods are sometimes termed "dry" flood-proofing to distinguish them from so-called "wet" methods in which it is accepted that the interior of the building will be flooded. Flood damage is kept to a minimum by using special water-resistant construction materials in the lower levels of the building. Wet flood-proofing is frequently the only method of controlling or reducing flood damage to existing buildings in areas subject to flooding. It is seldom advocated for new buildings because of the cost of drying out, the delay in return to use, and the clean-up required after a flood. Flood-Proofing Services All services of flood-proofed buildings - electrical, heating, road, sewer - must also be protected from flood damage. Sewers and water pipes can be protected by special valves; telephone equipment and electrical transformers must be located above design flood levels. Auxiliary generators may have to be installed, and hydro lines, access roads and bridges to buildings must be protected. Buried hydro lines and gas mains must be located and designed to resist damage from possible flood erosion or uplift forces. Flood-Proofing Basements Flood-proofing of basements can be a special problem for residences situated in a fringe flood zone where only the basements may be flooded. Here there are two basic flood-proofing methods:
The principal consideration in choosing between the two methods is the permeability of the surrounding soil and backfill material around the basement walls. The first method requires additional basement wall protection, high quality construction and special drainage control methods. The second method requires a sump pump with the capacity to pump out infiltration inflow at a rate sufficient to limit the build-up of excessive hydrostatic pressure. It should only be considered if reliable electrical power can be provided during flood conditions. Both methods require professional advice from experienced soils engineers. Case Studies Twelve case studies are presented in the report1 not only to illustrate the use of flood- proofing in Canadian structures but also to give some indication of possible costs. Design modifications were made to several structures using various flood-proofing methods. The majority of the case studies were assessed for flood depths of from 3 to 5 ft (1 to 1.5 m), approximately the average flood depth in the flood plains across Canada. They included industrial buildings, apartments, commercial plazas and a single-family residence (Table I). Drawings and itemized sheets of structural materials were compiled for each structure and are published as a separate volume. Table I. Flood-Proofing Case Studies, New Structures¹
Case Study Conclusions
General Conclusion Although flood-proofing has rarely been considered in Canada as an alternative to zoning or flood protection works, it may be viable under some circumstances. For example, the capital outlay for flood-proofing industrial buildings in a flood plain is often much less than that for expropriation, relocation, or major flood control works. The potential advantages of flood-proofing are greatest in metropolitan areas where low-hazard flood lands have already been developed or where great pressure is being exerted to use underdeveloped land in the fringe of defined flood zones. Selective flood-proofing can be carried out in these areas with safety and often with greater economy than other forms of flood plain management. Reference
Bibliography
|
|