2011 Projects: Classrooms in Buildings 3, 9, and E25
During the summer and fall semester of 2011, two classrooms in buildings 3 and 9 were constructed: 3-333 and 9-354. One lecture hall and one classroom in building E25 were renovated: E25-111 and E25-117. Each of these classrooms was upgraded as follows:
- New walls, floors, ceilings, lighting, and HVAC systems
- New fixed tablet auditorium seating (3-333 and E25-111)
- New fixed tables and chairs (9-354)
- Motorized blackout and sun window shades (3-333)
- Single ceiling-mounted video projector, and two motorized projection screens (E25-117)
- Dual video projection and electrical outlets at all seats (3-333, 9-354, and E25-111)
- Lecture capture technology (E25-111 and E25-117)
- Wireless network access
Follow the links above to view the detailed specifications for these classrooms.