Annual Report Homepage   Previous Next
SMA Logo & Rationale
Front Cover Design
Preamble
Vision & Mission
Committee Members & Directors
Programme Co-Chairs
Messages
Milestones
Programmes
Research
Particpation by Industry & NRIs
Job Placement
Admissions
Faculty & Staff
Students & Alumni
Events
 
     
  S.M. Projects (2004/2005)  
  Project abstracts can be viewed from the CD-ROM which is enclosed or the SMA website (http://www.sma.nus.edu.sg).  
     
  IMST Programme MEBCS Programme CS Programme  
     
  IMST Programme  
     
 
Resource Management of Offshore Units Construction Operations in Multi-Project Environment
     
Students :
Rajpurohit Dharmpal Singh, Wang Haiquan & Yang Yong Teck
     
SMA Supervisors :
Assoc Prof Sivakumar Appa Iyer (Singapore), Prof Yoon Soon Fatt (Singapore) & Dr Stanley B. Gershwin (MIT)
     
Company Supervisors :
Mr David Wong, Mr Kek Sei Wee & Mr Meng Fanming (Keppel FELS Limited)
     
 
 

Project Abstract:

The operational flow of drilling rig construction comprises of several sub-operations, each with their own set of resource requirements. With the limited resources in the yard, it is even more imperative that usage of precious resources such as labor, space, and operational support tools is utilized to give the optimum output in terms of high throughput and low cost and lead-time. Three areas of operations are looked into to improve the usage of these three resources. In the area of labor loading, effective methods of manpower forecasting are explored so as to better predict the future demand of the specialized manpower. For the space operational improvement, the inventory management of one commonly used material is studied with the aim of formalizing the replenishment policy and st¨ZA4e space reduction. Lastly, a set of heuristic is designed to optimize the inventory level and the usage method of one operational support resource so as to achieve a lower cost.

 
     