Building 18 Dreyfus building-Chemistry Building assessment by Steve Amanti, Senior Thesis 05-06 |
|||||
Yearly Energy Use Facts: Electricity: 7.2mill kWh Chilled H2O: 2.7million ton-hrs* Steam: 35.9million lbs** lighting load: 5% of yearly electrical load supply and exhaust fans: 45% of yearly electrical load *ton-hour = 12,000 BTUs of cooling **1 lb of steam = 1000 BTUs of heat |
|
Energy Use Factors: -High Hood Density -Lack of Exhaust Recovery System -Irresponsible Hood Use
17% of elect, steam, chilled water ~$350,000/year |
|||
| Building Overview Floor 1-4 house seven laboratories Floor 5 houses five labs The sub-basement features seven chemistry laboratories The sub-sub-basement houses the mechanical room and the laser laboratory. 3 main air handlers provide conditioned air to the laboratories and offices, driven by fans totaling 1000 horsepower and pumps totaling 340 horsepower. |
|||||