MIT Department of Architecture Workshop
4.199 - REMOTE COLLABORATIVE DESIGN: THE LISBON CHARRETTE

PROJECT REQUIREMENTS

MID REVIEW:
Will be announced on Monday, November 10th
Due date: Monday, November 17th, 9:00am

Presentation: a list of the Audio-visual material required for the presentation.
Due date:
Friday, November 14th, 9:00am (preliminary)
Sunday, November 16th, 6:00pm (final)

FINAL REVIEW
(metric scales to be determined)
3D Computer Model as a basis for:
Axonometric of block proposal (option exploded axonometric
Ground Plan of Block with Access (semi-public), Public and Private Space (coded)
Block Sections and Elevations (folfed out from Ground Plan)
Exterior Perspectives (2) collage with site photographs
Inner Block Perspectives (2) (courtyard and common space)

Dwelling typologies:
Plan, Section, Axonometric
and/or
Physical Model demonstrating typical unit cluster with circulation and common areas.

Due date: Monday, December 1st, 9:00am

Presentation: a list of the Audio-visual material required for the presentation.
Due date:
Friday, November 28th, 9:00am (preliminary)
Sunday, November 30th, 6:00pm (final)

LAST REQUIREMENT:
Designing of panels summarizing each team's design project so that one can set up an itinerary exhibition to be sequentially displayed in the schools involved. (MIT grades will not be released without these panels).


For comments and questions on the requirements, please email Prof. Testa at ptesta@mit.edu