| Week of |
Tue |
Thu |
| Feb 04 |
L01: Course overview. Resonance, scopes |
L02: AM, Diodes
|
| Feb 11 |
L03: BJT
|
Lab #1 Exercise 1 checkoff |
|
L04: LTspice
|
| Feb 18 |
No class - Tue: Monday schedule
|
L05: BJT
|
| Feb 25 |
L06: JFET, MOSFET
|
L07: Op-amps part 1
|
| Mar 04 |
L08:Op-amps - ECG
|
L09: Power supplies
|
| Mar 11 |
L10: Sensors, optoisolators, triacs; project kickoff
|
L11: Pulse-Oximetry, 555 Circuits, ADC, DAC
|
| Mar 18 |
L12: Practical issues, pcb layout
|
Quiz
|
| Mar 25 |
Spring break
|
| Apr 01 |
|
Writing workshop: final report (attendance required) |
|
L13: Electronic Design Studio (EDS) Overview
|
| Apr 08 |
L14: Noise, ADC bits, drivers, transmission lines
|
|
Project Block Diagram Meeting by 5pm
|
Project Proposal Draft
Schedule optional presentation rehearsal with staff
|
|
| Apr 15 |
Mon: Patriots Day, Tue: Student holiday
|
Presentation preparation with Dave/Atissa Project Design Presentations (Tue/Thu during class time) - attendance required
|
| Apr 22 |
Presentation preparation with Dave/Atissa Project Design Presentations (Tue/Thu during class time) - attendance required
Revised Project Proposals due (Fri) by 5pm
|
Project Checklist Meeting with Staff by (Fri) by 5pm
Final project integration and debugging One week remaining!
|
| Apr 29 |
Final project debugged - finishing touches! Presentation
follow-up with Dave/Atissa The last week!
|
| May 06 |
Project Checkoffs 2:30-5pm (Tue)
|
Project demos and taping @ 4-7 pm (Wed)
|
| May 13 |
Draft report Workshop with Dave/Atissa Write report
|
Project Report due 5/16 @5p
|