1.40/1.401 Project Management

Fall 1997

Professor Sarah Slaughter

Course Material

Course Outline

Course Schedule

Case Study

Course Material


Textbook

Reading packet, available at CopyTech (Bldg. 11, Rm. 004). All readings required for class are included in the reading packet. Additional references for specific topics are on Reserve at Rotch Library.

On Reserve at Rotch Library:

    1. Francis Ching, Building Construction Illustrated, Van Nostrand Reinhold, New York, 1991.
    2. Michael T. Callahan, Daniel G. Quackenbush, James E. Rowings, Construction Project Scheduling, McGraw-Hill, New York, 1992.
    3. Rosalie T. Ruegg, Harold E. Marshall, Building Economics, Van Nostrand Reinhold, New York, 1990.
    4. Donald S. Barrie, Boyd C. Paulson, Professional Construction Management: Including C.M., Design-Construct, and General Contracting, McGraw-Hill, New York, 1992.

 

CASE STUDY DATA

List of material on reserve at Rotch Library

DRAWINGS

REGIONAL TRANSPORTATION CENTER - ALTERNATE COVER DESIGN

C-1A - Industri-Plex site location of work and 1996 work areas.

C-2 - Existing conditions plan

C-2A - Compilation of historical utilities

C-2B - Compilation of existing utilities (1/2)

C-2C - Compilation of existing utilities (2/2)

C-2D - Pre-remediation extent of arsenic lead and chromium at or above action levels

C-3 - Demolition plan

C-4 - Excavation plan

C-5 - EPA/DEP approval

C-5A - Layout plan

C-6 - Erosion control plan

C-7 - Erosion and sediment control details

C-8 - RTC site final grading and drainage plan

C-9 - Alternate cover transition plan

C-10 - Alternate cover transition details (1/3)

C-11 - Alternate cover transition details (2/3)

C-11A-Alternate cover transition details (3/3)

C-12 - RTC site transition details (1/2)

C-13 - RTC site transition details (2/2)

C-14 - Alternate cover details (1/2)

C-15 - Alternate cover details (2/2)

C-16 - Site details (1/3)

C-17 - Site details (2/3)

C-17A- Site details (3/3)

C-18 - Site sections (1/3)

C-19 - Site sections (2/3)

C-20 - Site sections (3/3)

REPORTS

REGIONAL TRANSPORTATION CENTER

Feasibility Study

Environmental Notification Form

Summary of Proposed Institutional Controls


Back to:

Top of page

Textbook

Case Study: Drawings

Case Study: Reports


Course Outline

Course Schedule

Case Study

Course Material


Last Modified: December 12, 1997

Salvatore Di Bernardo - sdiberna@mit.edu