Day 9: Announcements

Homework

Due Tuesday.
Questions?
Today's Assignment

Lab

NExt week is the BIG event....
5 pound weight available in 5-418 during "business hours"
AFTER you have completed the construction of the bridge, paint one "fassade" with a white wash or light spray of white. This is to enhance the visualization of the failure mode as it is filmed.


Today's outline......


Thursday walk-about

1. The Hallway in front of 3-133

Floor Loads
Tributary Area?
Dead Load Live Load
HOMEWORK PROBLEM 1

2. The Stairway between 1 and 2.

3. The Hallway above the infinate corridor.

4. Down the Hall towards Mass Ave.

note the expansion joint (separation joint) Secondary loads

5. The Dome Lobby Balcony

The system? Floor Load DL LL
Good exam question
Determine the total load on the balcony. Draw the FBD and indicated the reactions.

6. Stairway downstairs by Rotch Library

(JUMP)

7. 77 Mass Ave railing

what is the system?

8. The Kresge Auditorium. (Eero Saarinen, 1955)

(from the student center)
System stability?
How do you draw the FBD?
Loading
DL LL (in the lobby)
Materials HOMEWORK PROBLEM 2