Case Study: Merowe Dam, Nile Basin, Sudan
Project: Environmental assessment of the sustainability of the
Merowe Dam for the next 100 yrs.
Our environmental assessment team will analyze the current hydropower
dam design, and then propose design and operational changes to
improve sustainability. The design process will be shaped by engineering
as well as environmental constraints. The project will emphasize
the long-term issues that are important for sustainability of
large dams. The following will be our areas of focus: