![]() Pieces of the house foundation sitting on the build site on Day 1. |
![]() Team members hammer the lumber in place for the house foundation. |
![]() Team members Frank Stone and Kevin Horne cut plywood for the floor structure. |
![]() Tom, John, Sean, Kurt and Kevin on Day 1 of construction. |
![]() Kevin, Kurt and John toast to completion of the floor structure! |
![]() Foundation for the 800 sq.ft. home is the first full size realization of the Solar 7 house floorplan. |
![]() The foundation was raised for easy underfloor access and trasfer to truck beds when moving time comes. |
![]() Kurt, Tom, Michelle and Kevin pause for a picture before floor installation. Kurt must have missed the boot memo. |
![]() Team members prep to install the Warmboard radiant flooring. |
![]() Albert, Rob, Kurt, Kevin, Dennis, Diane, Paul, Michelle, Jim and Tom |
![]() House foundation with the subfloor panels installed. |
![]() Installing PEX tubing into the subfloor of the living and dining areas. |
![]() Team members Paul, Michelle, Sarah and Lisa enjoy the ease of installation of the subfloor panels. |