Pieces of the house foundation sitting on the build site on Day 1. |
Team members hammer the lumber in place for the house foundation. |
Team members Frank Stone and Kevin Horne cut plywood for the floor structure. |
Tom, John, Sean, Kurt and Kevin on Day 1 of construction. |
Kevin, Kurt and John toast to completion of the floor structure! |
Foundation for the 800 sq.ft. home is the first full size realization of the Solar 7 house floorplan. |
The foundation was raised for easy underfloor access and trasfer to truck beds when moving time comes. |
Kurt, Tom, Michelle and Kevin pause for a picture before floor installation. Kurt must have missed the boot memo. |
Team members prep to install the Warmboard radiant flooring. |
Albert, Rob, Kurt, Kevin, Dennis, Diane, Paul, Michelle, Jim and Tom |
House foundation with the subfloor panels installed. |
Installing the PEX tubing into the Warmboard panels. |
Installing PEX tubing into the subfloor of the living and dining areas. |
Team members Paul, Michelle, Sarah and Lisa enjoy the ease of installation of the subfloor panels. |