A.  |
A. Hole No. 1 with the irrigation facility.
|
B. |
B. Going up to play Hole No. 2 and going
down to play Hole No. 3.
|
C. |
C. Going up to play Hole No. 7 and playing
Hole No. 11 in the channel under hill.
|
D. |
D. Detention wall collects water and delays
the flooding time.
Planting "Purple Loose Strife"
in front of the wall to present the area of wet land.
|