Concept

 Site Plan

 Detail Design


 

 

Site Plan

A. 

 

A. Hole No. 1 with the irrigation facility.

B. 

 

B. Going up to play Hole No. 2 and going down to play Hole No. 3.

 C.

 

C. Going up to play Hole No. 7 and playing Hole No. 11 in the channel under hill.

 D.

 

D. Detention wall collects water and delays the flooding time.
Planting "Purple Loose Strife" in front of the wall to present the area of wet land.

 

 

Grading & Drainage Plan
 
 

 

 

 

 

Planting Plan
 
   

| BACK to GOLF HOME | NEXT to DETAIL DESIGN |