Allen, Stuart J. and Edmund W. Schuster (1994), “Practical
Production Scheduling with Capacity Constraints and Dynamic
Demand: Family Planning and Disaggregation,” Production and
Inventory Management Journal, Vol. 35, No. 4, pp.
15-21.
Allen, Stuart J., Jack
L. Martin, and Edmund W. Schuster (1997), “A Simple Method for
the Multi-item, Single-level, Capacitated Scheduling Problem with
Set-up Times and Costs,” Production and Inventory Management
Journal, Vol. 38, No. 4, pp. 39-47.
D’Itri, Michael P.,
Stuart J. Allen, and Edmund W. Schuster (1999), “Capacitated
Scheduling of Multiple Products on a Single Processor with
Sequence Dependencies.” Production and Inventory Management
Journal, Vol. 40, No. 4, pp. 27-32.
Schuster, Edmund W. and Byron J. Finch (1990), “A
Deterministic Spreadsheet Simulation Model for Production
Scheduling in a Lumpy Demand Environment.” Production and
Inventory Management Journal, Vol. 31, No. 1, pp. 39 –
43.