The OPTOCHIP Offering and Schedule

The initial OPTOCHIP offering will enable each participating group to design a 2 mm square epitaxy-on-electronics GaAs OEIC chip containing light emitting diodes, m-s-m detectors, OPFETs, and enhancement- and depletion-mode MESFETs, and to receive six completed copies of their OEIC chip design to test and characterize. There is no cost for participating in the initial OPTOCHIP offering, but the groups chosen to participate are expected to commit to completing and submitting a chip design, and to providing the OPTOCHIP office at MIT full documentation of their designs and of the perfomance of their chips.

List of first offering participants


NEW!!!Important OPTOCHIP Dates

The important dates and milestones for the initial OPTOCHIP offering are as follows, and this information is expanded upon in the paragraphs that follow the listing of dates.

	    Date     Milestone

   Apr.  1, 1996     Interim e-mail status report due
   Apr. 27, 1996     Final design files and documentation due 
   May   1, 1996     Chip design submitted to MOSIS
   Jul. 15, 1996     IC chips received from MOSIS
   Oct. 15, 1996     Epitaxy and post-epi processing 
		     completed OEIC chips distributed to 
		     participating groups
   Dec. 31, 1996     Preliminary test report due
   Mar. 31, 1996     Final test report due


Project Procedures

The processs began with the preparation of a proposal for participation. A one- to two-page proposal describing the objectives of the proprosed project, the design and testing facilities available for work on the project, and the personnel to be involved with the work were sent to Professor Clifton Fonstad at MIT by October 1, 1995 (e-mail fonstad@mtl.mit.edu).

All of the groups submitting proposals were notified by November 15 of the outcome of the selection process, and those chosen to participate were given further information on the design tools and format to be used, detailed specifications of the optotelectronic and electronic devices available, and copies of the standard cell and other design files available at that time. They were given information on the other participants in the project, and urged to make contact with as many as possible.

The actual chip designs are being developed between December 1 and April 27, 1996, by the participating groups. It is anticipated that the participants (and organizers) will all be on pretty steep learning curves during the course of the OPTOCHIP Project, and communication between all parties involved will be essential to its success. A brief e-mail status reports on their design will be required from each group on April 1. These reports will be distributed to all OPTOCHIP participants to keep everyone informed on their colleagues' progress. The final design files, along with complete documentation (including SPICE simulations where appropriate), will be due on April 27, 1996.

The individual group design files will be combined into a single file for one multi-project chip approximately 7 mm on a side which will be submitted to MOSIS for the HGaAs3 run currently scheduled for May 1, 1996. A summary of the design will be distributed to all OPTOCHIP participants in May.

The turn around time for MOSIS run varies betwen 2 and 3 months, and the timetable allows for 2 1/2 months. Once the chips are received from MOSIS, they will be prepared for epitaxy in the MIT Microsystems Technology Laboratory (MTL), and the necessary InGaAs/GaAs LED heterostructures will be grown on them by gas source molecular beam epitaxy (GS-MBE) in the laboratory of Professor Leslie Kolodziejski at MIT. The post-epitaxy processing will then also be done in MTL. The LED and electronics functionality will be confirmed in Prof. Fonstad's laboratories at MIT, after which the multi-project chips will be cut into the individual project chips.

The objective will be to deliver six completed OEIC chips to each participating group by October 15, 1996. A preliminary e-mail report on the chips will be due at MIT by December 31, 1996, and a final written report (final at least for purposes of the initial OPTOCHIP offering) will be due March 31, 1997. The final reports will be combined and distributed to participants and other interested parties in spring 1997.


OPTOCHIP Workshops

It is expected that a workshop will be held in the fall of 1996 for all participants in the initial OPTOCHIP offering, along with participants in the second OPTOCHIP offering (planned for the 1996-97 academic year). The date and place for this meeting has yet to be determined.