Systems and Labs |
||
Fall 2008
|
||
Unified Faculty
|
Lecture |
Date Handed Out |
Date Due |
Topic
|
System Problems | Handouts | Reading | Solutions |
SPL1 | 9/4/08 | 9/11/08 | Pitot Static Tube Measurements | Anderson 3.4, 3.5. |
|||
SPL2 | 9/11/08 | 9/18/08 | Rocket Trajectory | Systems Problem 2 | SPL2 Solutions | ||
SPL4 | 9/25/08 | 10/2/08 | Water Rocket | Systems Problem 4 | Water Rocket Power Point | SPL4 Solutions | |
SPL5 | 10/2/08 | 10/9/08 | Water Rocket | Systems Problem 5 | SPL5 Solutions | ||
SPL6 | 10/10/08 | 10/24/08 | Water Rocket | Systems Problem 6 | |||
SPL7 | 11/12/08 | 11/26/08 | Trusses | Systems Problem 7 |