Before placing on siding, Raindrop rain guard was installed to help provide a water resistant layer.
|
|
Corey and Cristof rapidly siding the west elevation with red cedar tongue & groove boards
|
||||||||||||||
Corey and Cristof check the boards to make sure that everything is staying level and plumb. |
|
Carefule measurements are taken to properly fit the red cedar siding with fascia boards. |
||||||||||||||
The red cedar begins to reveal the final look of the exterior. |
|
Installation of the the Hardie boards begins on the north module. |
|
||||||||||