Brockton issued a request for proposals for a turnkey system design, installation, operations and maintenance. One proposal was submitted by a project team led by Global Solar. Another proposal by a different team was rejected due to noncompliance with terms of the RFP. The City of Brockton is evaluating the proposal from the team that includes:
Global Solar Energy as the prime contractor, RWE Schott Solar as the PV panel manufacturer, Landerholm Electric performing installation and O&M services, Fat Spaniel Techologies for data acquisition and reporting, SatCon Technology for power conditioning, J. Derenzo & Company for site preparation, and Coler and Colantonio for site engineering/environmental work.
The team made a presentation to the City of Brockton on November 16, 2005. Global Solar Team Presentation to develop a 425 kW solar array. The proposal included development of a solar learning plaza that would include a non-functioning solar panel that children can safely touch during educational activities.
About the Grove Street Site
Why a Solar Brightfield?
Project Goals and Objectives
Project Partners
Project Steps and Timeline
Barriers Encountered and Methods for Overcoming Barriers
Phase I Proposal from Global Solar Team
Lessons Learned
|